Water Tanks Completed

KDF HQ 108m3 12m High Tower

KDF HQ, Nairobi | Completed 2024

Project Overview

108 cubic meter elevated steel water tank at 12 meters height for Kenya Defence Forces headquarters. Military-grade construction with security features.

Technical Specifications

Project Size

2,500 sq meters

Duration

3 months

Team Size

15 workers

Certification

ISO 9001:2015

Materials & Equipment

Galvanized Steel Bolts & Fasteners Welding Equipment Protective Coating

Project Timeline

Planning & Design

Week 1-2

Site assessment, measurements, and technical drawings

Fabrication

Week 3-6

Steel cutting, welding, and quality control

Transportation

Week 7

Safe delivery to project site

Installation & Handover

Week 8-12

On-site assembly and final inspection

Project Details

Location

KDF HQ, Nairobi

Completed

2024

Category

Water Tanks

Client

Kenya Defence Forces

Want a similar project?

Get a free quote for your engineering needs.

Share This Project

Similar Projects

Dhaval Ghande 12m 50m3 Elevated Tank
Water Tanks

Dhaval Ghande 12m 50m3 Elevated Tank

12-meter elevated steel water tank with 50 cubic meter capacity for residential water supply. Includ...

Gekone, Bomet County View Details
Kenya Utalii College 60m3 21m Tower
Water Tanks

Kenya Utalii College 60m3 21m Tower

60 cubic meter elevated steel water tank standing 21 meters high for institutional water supply. Fea...

Utalii, Nairobi View Details
Muthaiga North Project 18m Tower 10m3
Water Tanks

Muthaiga North Project 18m Tower 10m3

18-meter elevated water tower with 10 cubic meter capacity for Muthaiga North residential area. Comp...

Muthaiga North, Nairobi View Details
Operation successful!